Connect with us

NEWS

Easter bunny – Where did he come from?

Published

on

Easter is the Christian celebration of the resurrection of Jesus, but the seasonal chocolate eggs and the bunny who delivers them are nowhere to be found in scripture.

The exact origins of the Easter bunny are clouded in mystery. One theory is that the symbol of the rabbit stems from pagan tradition, specifically the festival of Eostre—a goddess of fertility whose animal symbol was a bunny. Rabbits, known for their energetic breeding, have traditionally symbolized fertility.

The Easter Bunny (also called the Easter Rabbit or Easter Hare) is a folkloric figure and symbol of Easter, depicted as a rabbit bringing Easter eggs. Originating among German Lutherans, the “Easter Hare” originally played the role of a judge, energetic breeding children were good or disobedient in behavior at the start of the season of Eastertide.[1] The Easter Bunny is sometimes depicted with clothes. In legend, the creature carries colored eggs in his basket, candy, and sometimes also toys to the homes of children, and as such shows similarities to Santa Claus or the Christkind, as they both bring gifts to children on the night before their respective holidays. The custom was first[2][unreliable source?] mentioned in Georg Franck von Franckenau‘s De ovis paschalibus[3] (‘About Easter Eggs’) in 1682, referring to a German tradition of an Easter Hare bringing Easter eggs for the children.

No matter his origin, the Easter bunny is a popular cultural icon enjoyed by kids and families each Easter.

Continue Reading

NEWS

BISD makes final push on bond election information

Published

on

By BARBARA GREEN
[email protected]
With just 10 days left until the May 4 school bond election, Bowie Independent School District officials made a final push this week to get information out to the public.
The district conducted two town hall meetings at different times on April 24 and took part in a virtual town hall the day before. There were almost 40 people attending, which is more than all the town hall meetings conducted during the October vote. Another 12-15 attended a noontime meeting.
Superintendent Blake Enlow went through a powerpoint outlining the bond proposal and then took questions. The same bond plan failed last November 1,079 to 855.
The plan includes the following projects: A new intermediate school for grades three to five, built at the corner of Rock and Tarrant. The existing junior high is overcapacity and due to age is Texas Education Agency non-compliant.

The 100-plus year old building will be repurposed for offices and staff development. The existing BJH gyms will be maintained for community use. The new intermediate will handle 600 students and include a storm shelter, ballistic rated entrance glazing and keep student traffic away from the street.
The junior high students would move to the existing intermediate after renovations. There will be a dedicated sixth grade wing, a renovated ag science facility and a new weight room and fieldhouse. The old classrooms, gym and locker would be renovated. The school also would include storm shelter areas, ballistic glazing and keep students away from the street.
The existing elementary campus will receive a new bus lane and covered pick-up and drop-off areas, as well as new staff and visitor parking that allows for safe walking to the entry. The existing high school will have a new weight room which it does not have now, plus new restrooms at the baseball/softball fields with a handicap parking area.
Citizens asked questions about how the plan was developed and how the costs figures were calculated.

Read the full story and citizens questions in the weekend Bowie News.

Pictured above: Superintendent Blake Enlow talks to citizens at a bond election town hall meeting Thursday night.

Continue Reading

NEWS

Nelson Street see big concrete pour for drainage

Published

on

By BARBARA GREEN
[email protected]
Bowie City Manager Bert Cunningham presented a lengthy monthly report to the city council Monday night updating the group on the various building projects and program grant applications.
The council has not met since March 11 due to a lack of action items, so there was a lot to catch up with.
City Manager report
Nelson Street project – Cunningham said the project is proceeding well. Downstream of the bridge the contractor is about to pour concrete into the creek to maintain the water flow. The main streets also are being cleared of debris so they will be ready for the pending concrete pour.
Right now the biggest obstacle is the unfinished drop box at the intersection of Mill and Nelson. In flux for the last couple of months, the engineer is requiring the contractor remove the drop box because the dirt under the structure was not compaction tested as required by the contract.

Read the full story in the weekend Bowie News.

Continue Reading

NEWS

Early voting has two more days, April 29-30

Published

on

The final two days of early voting for the May 4 school bond elections in Bowie and Forestburg will be April 29-30, 8 a.m. to 5 p.m. at the Bowie Senior Citizens Center.
Sample ballots are available on the county website at co.montague.tx.us, click on the elections tab. As of 2 p.m. Thursday the total was 741 for early voting for both districts’

Continue Reading
Ad
Ad
Ad
Ad
Ad

Trending