Connect with us

NEWS

Clean-up, repair begins on Lamb, Nelson Streets

Published

on


Initial clean-up work began Wednesday on the collapsed drainage culverts at Lamb and Nelson Streets. The Bowie City Council Monday gave approval for $50,000 of infrastructure funds to begin the repairs. These culverts run under Lamb Street, a street closed for more than two years due to the damage. Public Works Director Stony Lowrance said a portion of the drainage will remain to allow water flow, but a contractor will use an excavator to remove tree limbs, concrete and other debris so the culvert repair can begin. The council asked for more cost estimates. (Photo by Barbara Green)
Continue Reading

NEWS

Missing man has close ties with Nocona

Published

on

Continue Reading

NEWS

City staff examines new generators for water plant

Published

on

City of Bowie officials were on hand to inspect the emergency electrical generators that were delivered last week.
Mayor Gaylynn Burris and City Manager Bert Cunningham inspected one of three emergency electrical generators purchased as part of an ongoing Federal Emergency Management Agency Hazard Mitigation Grant. They also talked with Jay Evans, head of the city electric department, and Jerry Sutton, director of the water treatment plant about the next step for installation of the generators.
This grant provides funding for one 150 kW and two 250 kW generators for use at the water treatment plant.

Read the full story in the mid-week Bowie News.

City Manager Bert Cunningham and Mayor Gaylynn Burris talk with the electric and water department staff about the new generators. (Photo by Cindy Roller)

Continue Reading

NEWS

Council takes no action on litigation issue

Published

on

No action was taken on a legal issue after members of the Bowie City Council met in a called closed session at 4 p.m. on July 12.
City Secretary Sandy Page said the council met for almost one hour for “consultation with attorney – Midwest Waste Services LLC vs. City of Bowie.
This lawsuit goes back to August 2019 when Midwest sued the city for its action requiring those who receive city water outside the city limits to use the designated waste collector, which is Waste Connections. This was shortly after the city signed a new long-term contract with WC.
The suit was dismissed in June 2020 on two points in the suit, but City Manager Bert Cunningham said a third point remained in mediation.

Continue Reading
Ad
Ad
Ad
Ad
Ad

Trending