Connect with us

NEWS

Engineers work on plans for pump station

Published

on

Mike Tibbetts of Hayter Engineering and Steve Ruse, structural engineer, were at the City of Bowie raw water pump station this past week to take a look at the location where a new raw water pump will be added at the directive of Texas Commission on Environmental Quality. The unfunded state mandate requires the city to add a 60-hp pump, to the present pair of 200-hp pumps in order to meet the capacity requirements of state standards. Estimated cost of the pump is between $850,000 to $950,000. (Courtesy photos)

(Right) Jay Evans, head of the City of Bowie Electric Department works with Engineer Tom Ruse as they examine the power needs at the raw water pump station.. The city has been directed by state officials to add a 60-hp pump to the station .
Continue Reading

NEWS

Heat warning extends into Wednesday evening

Published

on

The City of Bowie reports an EXTREME HEAT WARNING will be in effect from 8 p.m. tonight until 8 p.m. tomorrow night. Please be careful.

Hear Audio Alert:https://hrpow.us/RA3mBoC

Continue Reading

NEWS

Pecan Street boil notice continues

Published

on

BOIL WATER NOTICE for 500-700 W. Pecan St. remains active. Affected residents needing bottled water should call (940) 977-4941.

Hear Audio Alert:https://hrpow.us/odv2S3E

Continue Reading

NEWS

Bowie ISD address transfer student controversy

Published

on

The Bowie Independent School District has issued the following open letter to community regarding negotiations with four other districts who pick up students inside this district and take them to their schools.

https://bowienewsonline.com/wp-content/uploads/2026/07/An-Open-Letter-to-the-Bowie-ISD-Community-2.pdf

Please click on the above link to read the full letter.

Continue Reading
Ad
Ad
Ad
Ad
Ad
Ad
Ad

Trending